Bathroom Renovation Cost Dubai: AED Prices by Size

A standard bathroom renovation in Dubai usually costs between AED 18,000 and AED 35,000 for a 2m by 2.5m space with mid range finishes. A small guest bathroom can start near AED 12,000, while a master bathroom with premium marble and custom joinery often reaches AED 50,000 to AED 80,000. The final figure depends on size, finish grade and how much of the existing plumbing and waterproofing can stay.

Why work with Noor al Sundus

  • In house joinery production facilities in Dubai
  • Turnkey bathroom renovation service
  • Own construction and finishing team
  • In house design and approvals team
  • Serving Palm Jumeirah, JVC and Dubai
  • Direct WhatsApp contact at +971504877263

Bathroom renovation Dubai cost by size and finish

Most Dubai bathrooms fall into three price bands depending on size, material grade and how much of the existing layout is retained. The table below is a practical planning range for a full turnkey renovation including waterproofing, tiling, sanitaryware, vanity, mirror and basic lighting.

Bathroom typeTypical sizeBasic finishMid range finishPremium finish
Small guest or maid bathroom1.8m x 2mAED 12,000 to 16,000AED 17,000 to 24,000AED 28,000 to 40,000
Standard family bathroom2m x 2.5mAED 18,000 to 25,000AED 26,000 to 35,000AED 42,000 to 60,000
Master bathroom3m x 3m or largerAED 30,000 to 42,000AED 45,000 to 65,000AED 70,000 to 100,000 plus

A JVC apartment bathroom with a kept layout and porcelain tiles often lands around AED 22,000 to AED 28,000. A Palm Jumeirah master bathroom with a custom vanity, marble surfaces and better lighting typically starts around AED 65,000.

Bathroom fit out cost in Dubai

A bathroom fit out cost in Dubai is usually AED 18,000 to AED 35,000 for a standard 2m by 2.5m bathroom with mid range finishes. This covers the same scope as a full renovation: strip out, waterproofing, tiling, sanitaryware, vanity, mirror and lighting.

Some contractors quote fit out and renovation separately. In our quotes, a bathroom fit out is the complete turnkey package. It includes all labour, materials, removal of old items and handover. The cost changes with tile size, fixture brand and whether the layout stays the same.

Bathroom full renovation cost in Dubai

A full bathroom renovation in Dubai starts near AED 18,000 for a standard family bathroom and can reach AED 80,000 or more for a master bathroom with premium marble and custom joinery. Full renovation means we strip the room back to the structure and rebuild every layer.

That includes new waterproofing, new plumbing if points move, new screed, new tiles, new sanitaryware, new vanity and new lighting. A small guest bathroom full renovation can start around AED 12,000. A Palm Jumeirah master bathroom full renovation often starts around AED 65,000.

What drives bathroom remodel cost Dubai

The final cost is less about the room size than what is hidden behind the tiles and how much of the existing plumbing can stay. Each factor below can move a quote by AED 3,000 to AED 15,000.

Waterproofing and substrate repair

This is the most important cost. A new cementitious membrane on floors and wet walls usually adds AED 2,500 to AED 5,000. If the existing screed is damaged, repair work adds more.

Tiling and surface finishes

Tile cost varies from AED 40 per square metre to AED 350 or more for large format porcelain or marble. Laying large format tiles takes more labour.

Plumbing and DEWA compliant work

Moving a toilet, shower drain or basin point means new pipe runs and chasing. Keeping the existing drainage points is the fastest way to protect your budget.

Fixtures and sanitaryware

A basic RAK or similar basin and WC set may cost AED 1,200 to AED 2,500. Premium concealed systems, rain showers and smart toilets push this above AED 10,000.

Joinery vanity and storage

A ready made vanity can cost AED 1,800 to AED 4,000. A custom vanity made in our own joinery production facility starts around AED 5,000 depending on size, veneer and stone top.

Lighting and electrical

An LED mirror and two IP44 rated downlights usually add AED 900 to AED 2,500. Low voltage isolation and repositioning switches add a little more.

A mid range specification list often looks like this:

  • Porcelain wall and floor tiles in 60x60 cm format
  • RAK or equivalent basin, WC and bidet fittings
  • Thermostatic shower mixer with rain head
  • Soft close PVC vanity with solid surface top
  • LED mirror and two IP44 rated downlights
  • Full cementitious waterproofing to all wet areas

Dubai open plan living space with white marble kitchen island and curved wood slat partition, finished by Noor al Sundus for a JVC renovation Turnkey joinery and marble detailing from our in-house team.

If you are also updating the kitchen, our kitchen renovation cost guide may help you plan both scopes together.

Typical bathroom renovation timeline in Dubai

A small or guest bathroom normally takes 2 to 3 weeks. A master bathroom with full waterproofing, retiling, custom joinery and lighting takes 3 to 5 weeks.

Here is the step by step process we follow on most Dubai jobs:

  1. Site measurement and scope confirmation within 2 to 3 working days.
  2. Protection, strip out and disposal in 1 to 2 days.
  3. Plumbing and electrical first fix plus waterproofing in 3 to 5 days.
  4. Tiling and grouting with drying time in 5 to 7 days.
  5. Joinery, fixtures, glass and lighting installation in 3 to 5 days.
  6. Snagging, DEWA compliant checks and handover in 1 to 2 days.

Villa projects in Palm Jumeirah and apartment projects in JVC can differ on access hours and building management approvals. We include those in the schedule before work starts.

If the bathroom is part of a larger renovation, see our villa renovation cost guide for full property budget planning.

When to get a fixed quote and what to prepare

A fixed quote is realistic only after a site survey. Photos and WhatsApp videos help, but waterproofing condition and drainage positions are hard to confirm without opening up or inspecting the existing bathroom.

Before you request a free bathroom renovation quote, prepare a few details:

  • Building name and community
  • Bathroom size and current layout
  • Preferred tile and fixture standard
  • Whether the bathroom is in a villa or apartment
  • Target start month

A clear quote should include the full scope, material schedule, payment milestones, start and finish dates and warranty period. You can view our completed renovation portfolio to check the standard of work before making a decision.

Warm Dubai hallway with geometric wooden accent wall, sheer curtains and marble floor by Noor al Sundus in Palm Jumeirah Custom joinery and marble flooring from a Palm Jumeirah interior renovation.

What clients say

JOHN PETER (5/5): Really nice work with that hospital renovation works .. Maintaining quality....
Munawwar Ali Khan (5/5): Highly Recommended – Trustworthy, Hardworking & Complete Fit-Out Team I would like to share my very positive experience with Noor Al Sundus Contracting following the completion of a major renovation and fit-out of our home. A special apprec
anil kumar (5/5): We had a very good experience working with Nasco Build. Their team was professional, responsive, and cooperative throughout the project. The quality of the fit-out and joinery work was very good, and they paid attention to our requirements

Frequently asked questions

How much does a bathroom renovation cost in Dubai?

For a standard 2m by 2.5m bathroom, budget AED 18,000 to AED 35,000 including waterproofing, tiling, sanitaryware, vanity and basic lighting. A small bathroom renovation cost Dubai usually starts around AED 12,000 to AED 18,000. A master bathroom renovation Dubai with premium marble or custom joinery can reach AED 50,000 to AED 80,000.

What does a bathroom renovation cost?

A bathroom renovation in Dubai costs between AED 18,000 and AED 35,000 for a standard 2m by 2.5m room with mid range finishes. Small guest bathrooms start near AED 12,000, and master bathrooms with premium marble and custom joinery can reach AED 50,000 to AED 80,000. The exact price depends on waterproofing condition, tile choice and whether plumbing points move.

How much does it cost to remodel a bathroom?

Remodelling a bathroom in Dubai usually costs the same as a full renovation, so budget AED 18,000 to AED 35,000 for a standard family bathroom. A basic remodel that keeps the layout can start around AED 12,000. A premium remodel with new marble, a custom vanity and upgraded lighting can go above AED 65,000.

What is included in a bathroom fit out cost in Dubai?

A bathroom fit out cost in Dubai includes strip out, waterproofing, plumbing and electrical first fix, tiling, sanitaryware, vanity, mirror, lighting and handover. For a standard 2m by 2.5m bathroom, that package usually costs AED 18,000 to AED 35,000. Custom joinery from our own production facility is quoted separately or as part of the package.

How much does a full bathroom renovation cost in Dubai?

A full bathroom renovation in Dubai starts around AED 18,000 for a standard family bathroom. A master bathroom with premium marble and custom joinery often costs AED 50,000 to AED 80,000. The full renovation includes new waterproofing, new pipes if needed, new tiles, new fixtures and new lighting.

How long does a bathroom renovation take in Dubai?

A typical guest bathroom takes 2 to 3 weeks. A master bathroom with full waterproofing, retiling, custom vanity and lighting usually takes 3 to 5 weeks. Drying time and building approvals can add a few days.

Do I need a permit for a bathroom renovation in Dubai?

Structural changes require approval. Most bathrooms need building management NOC and sometimes Dubai Municipality or developer approval for layout changes. Our approvals team prepares and submits the documents.

What is the cheapest way to renovate a bathroom in Dubai?

Keep the existing drain and water supply positions. Choose porcelain tiles, a ready made vanity and standard fixtures. A small bathroom in JVC can be completed from around AED 12,000 with this approach. Do not skip waterproofing because that is the most expensive future repair.

What hidden costs should I expect in a bathroom renovation Dubai price?

Hidden water damage behind old tiles, defective pipework, access restrictions in apartments and moving the water heater can add AED 3,000 to AED 10,000. A fixed quote after a site inspection reduces these surprises. We check the substrate before confirming the final price.